Ophir Energy announces that drilling operations have now commenced on the Mlinzi Mbali-1 well in Block 7* which is located in Tanzania. Ophir has an 80% net interest and the well is located c.210km east of Dar es Salaam and is being drilled by the Deepsea Metro I drill ship.

Tanzania-flag

Mlinzi Mbali-1 is the first well on Block 7 and is targeting a structural crest within a Lower Cretaceous channel complex, with secondary targets in the Upper Cretaceous and the Jurassic. Pre-drill estimates show that the two primary channel reservoirs in the Lower Cretaceous have the potential to contain Pmean prospective resources of c.10 TCF.

Success would significantly de-risk the total resource potential within the overall Mlinzi Channel complex, which is estimated at >20 TCF, as well as in other structures within the Block.

The well is located in a water depth of approximately 2,600m and has a planned Total Depth of 5,650m True Vertical Depth Sub Sea. Operations are expected to take approximately 50 days.

edited from